Reedsville Utilities


  • Midwest Contract Operations Inc, Manager
  • Phone 920-754-4094
  • Fax 920-754-4103
  • Email Utilities@reedsville.org

  Waste Water
  Treatment Facility

  Water Utility

Offices Wastewater Plant
Offices Wastewater Plant


Design Criteria:

  • Design Population 1322
  • Average Daily Flow - Dry .168 mgd
  • Average Daily Flow - Wet .324 mgd
  • Maximum Daily Flow .690 mgd
  • Maximum Design B.O.D. 599 lbs/day
  • Average Daily SS 366 lbs/day
  • Design Phosphorus 16.2 lbs/day

As of 10/98 the plant is operating at 40 percent of it's total capacity.

Back



System Consists Of:

  • 35,000 ft. of 8" collection main
  • 2,110 ft of 10" collection main
  • 2,020 ft of 12" collection main
  • 7,250 ft of force main

Back



2 - Lift Pump Stations:

Main Station:

  • 2 - 17 hp sanitary pumps 282 gpm 137 TDH
  • 2 - 42 hp storm water pumps 563 gpm 137 TDH

Subdivision Secondary:

  • 2 - 4 hp sanitary pumps 200 gpm 30 TDH

Back



General Information:

Waste Water Treatement Plant

Headworks Building

Grit removal system, influent grinder, influent sampling, influent metering.

Oxidation Ditch:

Capability to treat 690,000 gallons per day.

  • Oxidation Ditch total volume = 160,571 gal.
  • 1 - Clarifier total volume = 72,152 gal.
  • 2 - Return Activated Sludge Pumps
  • 1 - Waste Activated Sludge Pump
  • 1 - Sludge/Scum Transfer Pump
  • 1 - 9 bank/4 light ultraviolet disinfection structure, effluent sampling structure and post aeration
  • 1 - Sludge thickener
  • 1 - Sludge aqua store
  • 1 - Storm water holding basin = 728,590 gal

Back



Well 5

Well Number 5



Municipal Wells:

The Village has 2 - Deep Municipal Wells

Well #3 - 336ft deep - drilled in 1974

  • Produces 350 gallons/minute
  • Approximate run time = 4hrs/day
  • Disinfection Chemical - sodium hypochlorite
  • Corrosion Control Chemical - calgon C-4

Well #5 - 410ft deep drilled in 1998

  • Produces 350 gallons/minute
  • Approximate run time = 4hrs/day
  • Disinfection Chemical - sodium hypochlorite
  • Corrosion Control Chemical - calgon C-4

Back



Elevated Storage - Towers:

  • 1 - 100,000 gal sphere tower constructed in 1974
  • 1 - 45,000 gal pedestal tower constructed in 1938

A tower to replace the 45K tower will be constructed in approximately 2005. Size has not been determined.

Back



Miscellaneous Information:

  • Wells are setup with emergency power backup
  • The Village of Reedsville has a wellhead protection program in effect for its potable wells
  • The Village of Reedsville gives a discount to its residents during the 2nd and 3rd quarter for non-sewered water